- Long-term contract for PV project development up to the ready-to-build stage with the largest PV developer in Poland
- Execution period: from X 2021
- Location: Lower Silesia, Opole, Silesia, Lesser Poland
- Total capacity: 1.1 GW
- Long-term contracts for PV project development on commissioned lands
- Execution period: from June 2022
- Location: southwestern Poland
- Total capacity: planned several hundred MW
- PV Pełcznica – construction of own PV farm
- Execution period: April 2022 – September 2023
- Location: Lower Silesia
- Total capacity: 2.8 MW
- PV Świdnik – construction of own PV farm
- Execution period: December 2021 – December 2023
- Location: Lower Silesia
- Total capacity: 2 MW
- PV Volta 4 – supervision of the construction of a park consisting of 10 farms, each with a capacity of 1 MW, commissioned by a financial investor
- Execution period: June 2019 – August 2022
- Location: Lower Silesia
- Total capacity: planned up to 10 MW
- Execution of commercial projects for further resale
- Execution period: from January 2021
- Location: all over Poland
- Several projects at various stages of preparation with capacities ranging from 1 MW to several tens of MW
- Land portfolio
- Portfolio of secured lands with the following surface area:
- Over 100 hectares for small-scale investments (up to 10 MW)
- Approximately 420 hectares for large PV power plants (> 30 MW)