1. Long-term contract for PV project development up to the ready-to-build stage with the largest PV developer in Poland
    1. Execution period: from X 2021
    2. Location: Lower Silesia, Opole, Silesia, Lesser Poland
    3. Total capacity: 1.1 GW
  1. Long-term contracts for PV project development on commissioned lands
    1. Execution period: from June 2022
    2. Location: southwestern Poland
    3. Total capacity: planned several hundred MW
  1. PV Pełcznica – construction of own PV farm
    1. Execution period: April 2022 – September 2023
    2. Location: Lower Silesia
    3. Total capacity: 2.8 MW
  1. PV Świdnik – construction of own PV farm
    1. Execution period: December 2021 – December 2023
    2. Location: Lower Silesia
    3. Total capacity: 2 MW
  1. PV Volta 4 – supervision of the construction of a park consisting of 10 farms, each with a capacity of 1 MW, commissioned by a financial investor
    1. Execution period: June 2019 – August 2022
    2. Location: Lower Silesia
    3. Total capacity: planned up to 10 MW
  1. Execution of commercial projects for further resale
    1. Execution period: from January 2021
    2. Location: all over Poland
    3. Several projects at various stages of preparation with capacities ranging from 1 MW to several tens of MW
  1. Land portfolio
    1. Portfolio of secured lands with the following surface area:
      1. Over 100 hectares for small-scale investments (up to 10 MW)
      2. Approximately 420 hectares for large PV power plants (> 30 MW)